Licitação
ASF tenders A7 pavement-maintenance works between Mondragon and Piolenc
The eight-month works package covers asphalt milling and surfacing, plus road marking, on both carriageways between kilometre points 152 and 162.
Notícias de engenharia, energia, transporte, tecnologia e mercados com fontes primárias. Cada notícia tem a data do evento; os relatórios estatísticos identificam o período medido. Filtre por tipo de evento, país, setor, assunto ou data.
3 notícias
Licitação
The eight-month works package covers asphalt milling and surfacing, plus road marking, on both carriageways between kilometre points 152 and 162.
Licitação
The €12.49 million procurement pairs detailed design and BIM with demolition of the existing concrete bridge and construction of a new crossing and road upgrades.
Licitação
The 15-month package covers about 960,000 square metres of motorway surfacing, with additional pavement renewal and repairs at named interchanges and sections.
↑↓ moverPressione Enter para abrir/ para pesquisar em qualquer página