Closing soonContract notice
Wastewater treatment plant and submarine outfall for Rafina–Pikermi and Spata–Artemida, Greece
Original title: ΚΕΝΤΡΟ ΕΠΕΞΕΡΓΑΣΙΑΣ ΛΥΜΑΤΩΝ (ΚΕΛ) ΔΗΜΩΝ ΡΑΦΗΝΑΣ – ΠΙΚΕΡΜΙΟΥ ΚΑΙ ΣΠΑΤΩΝ - ΑΡΤΕΜΙΔΑΣ
The published deadline is less than seven days away. The buyer reports no separate status. EPC Feed last checked the official record on 23 October 2026.
Bid deadline
Closes in 4 days
- As stated
- UTC+02:00 (UTC+02:00)
- In UTC
- 3 Nov 2026, 09:00 UTC
- Time zone
- As stated in the notice
TED records 11:00 with a +02:00 offset (Athens time in November).
Scope
One contract in two parts. Part 1 covers the final and detailed design and full construction of the wastewater treatment plant and its submarine outfall (section 1A), putting them into operation with trial operation, completion tests and training of EYDAP staff (1B), and the design and construction of an administration building and environmental awareness and information centre on about 23,000 m² of the plant site (1C). Part 2 is the normal operation and maintenance of the plant and outfall by the contractor on behalf of EYDAP for seven years (84 months), with an option for one more year, with the contractor fully responsible for meeting effluent and sludge performance. The scope also includes the seabed and geotechnical surveys for the outfall, a HAZOP study, permits and operation and maintenance manuals; a preliminary design already exists. Total duration 114 months.
Official documents and links
- Official notice (TED)Official notice
- Procurement documents and submission (ESIDIS Promitheus)Procurement portal
Sources
This page summarises the official notice; bidders must rely on the official documents. Notice an error or an update from the buyer? Tell EPC Feed.