Glossary

The terms used across EPC Feed, in plain words. Contracts and procurement rules define them precisely; these definitions explain how EPC Feed uses them.

EPC
Engineering, procurement and construction: a contract in which one contractor designs the facility in detail, buys the equipment and materials, and builds it, usually handing it over ready to operate.
EPCI and EPCIC
EPC plus installation, used offshore where the contractor also installs platforms, pipelines or subsea equipment; EPCIC adds commissioning.
EPCM
Engineering, procurement and construction management: the contractor engineers the project and manages procurement and construction on the owner’s behalf, while the construction contracts usually sit with the owner.
FEED
Front-end engineering design: the engineering that defines a project well enough to estimate its cost and tender the EPC contract, usually before a final investment decision.
PDP
Process design package: the technology licensor’s definition of a process unit, which the FEED and EPC contractors build on.
FID
Final investment decision: the owner’s commitment to fund and build a project. Many EPC awards are conditional on it.
Letter of intent (LOI)
A document in which an owner states its intention to award a contract, often funding limited early work before the contract is signed.
Limited notice to proceed (LNTP)
An instruction to start defined early activities, such as engineering or ordering long-lead equipment, before the full contract is in force.
Design and build
A contract in which one contractor carries both the detailed design and the construction, common for roads, railways and water networks.
Design, build and operate (DBO)
Design and build followed by a period in which the contractor operates and maintains the asset for the owner.
Design, supply and installation
The World Bank’s “Plant” contract form, in which the contractor designs, supplies, installs and commissions equipment such as substations, lines or power plants.
Request for bids (RFB)
An invitation to submit priced bids against a defined specification. Older World Bank notices call it an invitation for bids.
Request for proposals (RFP)
An invitation to submit technical and financial proposals, used when the bidder contributes design or method.
Request for expressions of interest
An early notice asking firms to register interest, usually before a shortlist or prequalification.
Two-envelope bidding
Technical and financial parts are submitted separately; the financial envelopes of bidders that pass the technical stage are opened later.
Rated criteria
Evaluation that weighs technical and other factors alongside price, so the lowest price does not necessarily win.
Bid security
A guarantee, usually a bank guarantee, that a bidder forfeits if it withdraws its bid or refuses an award. A bid-securing declaration replaces it with a pledge.
Evaluated bid price
A bid price after the corrections and adjustments the bidding rules require; it can differ from both the price read out at opening and the signed contract price.
Contract award notice
The official publication of who won a contract, usually with the price and the other bidders.
Data date
The status date of a project schedule, drawn as a vertical line: work to its left is history, work to its right is forecast. The EPC Feed mark is built on it.
Anywhere on Earth (AoE)
Reading a date as ending when it has ended everywhere, at UTC−12. EPC Feed uses it when a notice gives no time zone.
BESS
Battery energy storage system.
FPSO
Floating production, storage and offloading unit: a ship-shaped facility that processes and stores oil and gas offshore.
KTA and Mtpa
Kilotonnes per annum and million tonnes per annum, the usual capacity units for process plants and LNG.