OpenRequest for proposals
N1 corridor Chimuara–Nicoadala, lot 1 (km 0–88): design and build road rehabilitation, Mozambique
The published deadline has not passed. The buyer reports no separate status. EPC Feed last checked the official record on 23 October 2026.
Bid deadline
Closes in 40 days
- As stated
- Maputo time (UTC+02:00)
- In UTC
- 9 Dec 2026, 08:00 UTC
- Time zone
- As stated in the notice
The notice text gives 9 December 2026 at 10:00 local time; the World Bank listing shows 10 December 2026. EPC Feed shows the earlier date. Confirm with the employer.
Scope
Rehabilitation of the first 88 km of the N1 corridor between Chimuara and Nicoadala under a design and build contract: 24 months of design and construction, a one-year defects notification period and a three-year warranty period. Experience requirements include similar contracts completed since 1 January 2015 above minimum values stated in the notice.