Kriva Palanka to Bulgarian border railway section (about 22.1 km, Corridor VIII): detailed design and construction
The published deadline has not passed. The buyer reports no separate status. EPC Feed last checked the official record on 23 October 2026.
Bid deadline
Closes in 82 days
- As stated
- UTC+01:00 (UTC+01:00)
- In UTC
- 20 Jan 2027, 11:00 UTC
- Time zone
- As stated in the notice
Scope
Detailed design and construction of about 22.1 km of new single-track railway between Kriva Palanka and the Bulgarian border, section 3 of the Corridor VIII eastern section, for a maximum design speed of 100 km/h. The notice publishes no estimated value.