OpenRequest for proposals

Divriği–Kars–Georgia border railway: design and construction with electrification, three lots, Türkiye

Directorate General of Infrastructure Investments (Türkiye)Türkiye

Open the official noticeAdd the deadline to a calendar

The published deadline has not passed. The buyer reports no separate status. EPC Feed last checked the official record on 23 October 2026.

Bid deadline

Closes in 53 days

As stated
Istanbul time (UTC+03:00)
In UTC
22 Dec 2026, 11:30 UTC
Time zone
Inferred by EPC Feed from the notice (see note)

The notice gives 22.12.2026, 14:30 for delivery in Ankara without naming a zone; it uses Türkiye time elsewhere.

Scope

Design and construction of infrastructure and superstructure works, including electrification, to rehabilitate the Divriği–Kars–Georgia border railway in three lots. The Eastern Türkiye Middle Corridor Railway Development Project is co-financed by the World Bank and the Asian Infrastructure Investment Bank. Proposals are delivered on paper; electronic procurement is not permitted.

Lots

  • Lot 1Section 1: Divriği–Erzincan
  • Lot 2Section 2: Erzincan–Erzurum
  • Lot 3Section 3: Erzurum–Kars

Official documents and links

Sources

  1. World Bank procurement notice OP00476726: Request for Proposals, ETMIC railway design and constructionOfficial noticeWorld BankPublished 22 October 2026Read 23 October 2026

This page summarises the official notice; bidders must rely on the official documents. Notice an error or an update from the buyer? Tell EPC Feed.

News about this tender

Other open tenders in this sector