Mpika–Kasama second 330 kV transmission line (200 km) and substation works, Zambia
An official contract award has been published. EPC Feed last checked the official record on 23 October 2026.
Scope
Design, supply and installation of a second 330 kV single-circuit overhead line of about 200 km between Mpika and Kasama, with substation works at both ends, under the RETRADE-SA MPA Phase 1: Zambia–Tanzania Interconnector Project. Contract duration 24 months.
Contract award
- Winner
- SINOTEC Consortium, China
- Signed price
- USD 38,279,359.30 + ZMW 155,152,727.35
- Award notified
- Award published
- Duration
- 24 months
| Bidder | Country | Evaluated price | Outcome |
|---|---|---|---|
| SINOTEC Consortium | China | USD 47,156,162.14 | Awarded |
| Transrail Lighting | India | USD 48,582,643.80 | Evaluated |
| KEC International | India | USD 49,023,638.99 | Evaluated |
| Sinohydro-Yellow River (JV) | China | USD 50,195,241.46 | Evaluated |
| Kalpataru Projects International | India | USD 55,642,299.48 | Evaluated |
| TBEA | China | USD 57,814,091.17 | Evaluated |
| China Jiangxi International Economic and Technical Cooperation Co., Ltd. | China | USD 65,139,655.97 | Evaluated |
| Amulet Group | South Africa | USD 74,231,319.32 | Evaluated |
| Energo (Nigeria) Limited and Chris Ejik International Agencies Limited JV | Nigeria | Not evaluated | RejectedBid security not provided |
| China Energy Engineering Group Henan Electric Power Design Institute Co. Ltd. (CEEC-HEPDI) | China | Not evaluated | RejectedNon responsive |
| JV Angelique, Skipper and BNC | India | Not evaluated | RejectedNon responsive |
| Sunir Company | Iran | Not evaluated | RejectedNon responsive |
Evaluated prices come from the award notice and may differ from the signed contract price. Where a procurement used rated criteria, the lowest price does not necessarily win; the notice may not publish the scores.
Official documents and links
- Contract award notice (World Bank)Award notice
- Invitation for bids (World Bank)Official notice
Sources
This page summarises the official notice; bidders must rely on the official documents. Notice an error or an update from the buyer? Tell EPC Feed.