Orascom Construction PLC is an engineering and construction contractor focused on infrastructure, industrial and high-end commercial projects in the Middle East, Africa and the United States. Its 2026 announcements include a power purchase agreement for a 900 MW wind farm in Egypt, in a consortium in which it holds 25%, and a consolidated backlog of USD 10.9 billion at 30 June 2026.
Renewables and storageWater and wastewaterTransport and logistics
EPC Feed · Engineering assessment
Orascom Construction: civil and electrical delivery connected to long-term infrastructure assets
By EPC Feed · Published · Updated
Orascom Construction’s engineering profile combines contractor delivery with development and operation of infrastructure concessions. The clearest current example is its 25% consortium interest in a 900 MW wind farm planned near Ras Shokeir in Egypt’s Gulf of Suez. Orascom, Aeolus and ENGIE signed a power purchase agreement with the Egyptian Electricity Transmission Company in March 2026. Orascom’s scope includes all civil and electrical balance-of-plant works and supply of certain local components. This is a precise delivery role inside a broader build-own-operate project: it is not the turbine supplier or the sole project developer, but its balance-of-plant scope links generation equipment to foundations, site infrastructure and electrical systems needed for export to the grid.4
The consortium structure is also important to a fair assessment. Aeolus holds 40%, Orascom 25% and ENGIE 35%, while the project is to be developed under a 25-year BOO model. The PPA is a major development milestone, but the March release said the project would proceed toward financial close expected in early Q3 2026. It did not confirm construction completion or commercial operation. That distinction matters because long-term generation assets move through different phases: power purchase arrangements and financing decisions establish a route to delivery, while civil and electrical construction, commissioning and operations follow later. The positive assessment focuses on the engineering scope Orascom has undertaken and the project experience it brings to that scope.4
Orascom’s 2025 results provide an operating reference point for that wind development. The company reported that the 650 MW Ras Ghareb BOO wind farm reached full commercial operation in Q2 2025 ahead of schedule, bringing its operational Egyptian wind capacity to 912.5 MW with another wind facility. The new Ras Shokeir project would be the consortium’s third wind farm, according to the March announcement. Repeated development in the same national power market creates an opportunity to apply local permitting, civil-construction and grid-interface experience. The sources do not detail which procedures, teams or designs are reused, so this is an engineering implication rather than a specific claim about transferred methods.54
The company’s concession activity extends beyond wind generation. Its FY2025 results say the Dammam Independent Sewage Treatment Plant in Saudi Arabia entered commercial operation in Q4 2025. They also describe continued EPC work at Project Wave, a 30-year seawater treatment and water-supply BOOT project in Abu Dhabi, and construction of a strategic goods warehouse in Fayoum, Egypt. These assignments demonstrate exposure to assets whose engineering must be followed by sustained operations, not just construction handover. In water infrastructure, process systems, storage, pumping, conveyance and operating interfaces shape whether a plant can deliver service over its concession period. The cited source does not provide technical specifications for Project Wave, so no capacity or process configuration is attributed here.5
By H1 2026, Orascom reported a consolidated backlog of US$10.9 billion and revenue of US$2,978.0 million, EBITDA of US$200.9 million and net profit attributable to shareholders of US$115.3 million for the half year. These are company-reported financial measures that describe business scale, not a direct measure of engineering quality. They nevertheless provide context for the range of active construction and concession activity across the group. The company notes that its footprint includes infrastructure, industrial and commercial projects across the Middle East, Africa and the United States, while group businesses include construction subsidiaries and a 50% stake in BESIX.3
The overall engineering assessment is strongest when Orascom is viewed as an infrastructure builder with selected long-duration ownership interests. The new wind project has a clearly bounded civil-and-electrical work package, while its operational wind and wastewater references show related experience at the asset level. The portfolio’s positive feature is the relationship between construction capability and continuing infrastructure operation. At the same time, project ownership, contractor scope and operating responsibility are distinct roles; the sources do not justify attributing every result to Orascom alone. This review therefore treats the 900 MW development as a consortium project and evaluates Orascom on its stated workshare and documented operating portfolio.453
On the record
No tenders or stories linked yet.
Projects named in sources
| Project | Country | Role | Year | Status |
|---|---|---|---|---|
| 900 MW wind farm near Ras Shokeir, Gulf of Suez4 | Egypt | Consortium developer, 25% share (build-own-operate) | 2026 | Planned |
Sources
- About - Orascom Construction
- Investors Updates - Orascom Construction
- Orascom Construction Reports Backlog of USD 10.9 Billion and EBITDA of USD 92.6 million in Q2 2026, Bringing EBITDA to USD 200.9 million in H1 2026
- Orascom Construction Consortium to Develop 900 MW Build-Own-Operate Wind Farm in Egypt
- FY 2025 Results announcement