Licitación
ASF tenders A7 pavement-maintenance works between Mondragon and Piolenc
The eight-month works package covers asphalt milling and surfacing, plus road marking, on both carriageways between kilometre points 152 and 162.
Noticias de ingeniería, energía, transporte, tecnología y mercados basadas en fuentes primarias. Cada noticia lleva la fecha de su evento; los informes estadísticos identifican el período medido. Filtre por tipo de evento, país, sector, asunto o fecha.
3 noticias
Licitación
The eight-month works package covers asphalt milling and surfacing, plus road marking, on both carriageways between kilometre points 152 and 162.
Licitación
The €12.49 million procurement pairs detailed design and BIM with demolition of the existing concrete bridge and construction of a new crossing and road upgrades.
Licitación
The 15-month package covers about 960,000 square metres of motorway surfacing, with additional pavement renewal and repairs at named interchanges and sections.
↑↓ moversePulse Intro para abrir/ para buscar desde cualquier página