OpenPrequalification

Stormwater drainage and urban redevelopment works in the 4th District of Porto Alegre, Brazil: design-build initial selection

Original title: Projeto e Obra de Engenharia das Intervenções na região do 4º Distrito de Porto Alegre

Departamento Municipal de Água e Esgotos (DMAE)Brazil

Open the official noticeAdd the deadline to a calendar

The published deadline has not passed. The buyer reports no separate status. EPC Feed last checked the official record on 23 October 2026.

Bid deadline

Closes in 31 days

As stated
Sao Paulo time (UTC−03:00)
In UTC
30 Nov 2026, 13:00 UTC
Time zone
Inferred by EPC Feed from the notice (see note)

The time 10:00 is from the API record. The notice gives office hours in Brasília time (BRT); the zone is inferred from that.

Scope

Initial selection of firms for the design and construction of stormwater drainage works and urban redevelopment works for streets and public squares in the 4th District of Porto Alegre, under design-build conditions of the FIDIC Yellow Book. The works form part of the Centro+4D programme.

Official documents and links

Sources

  1. World Bank procurement notice OP00471706: Stormwater drainage and urban redevelopment works in the 4th District of Porto Alegre, Brazil: design-build initial seleOfficial noticeWorld BankPublished 28 September 2026Read 23 October 2026

This page summarises the official notice; bidders must rely on the official documents. Notice an error or an update from the buyer? Tell EPC Feed.

Other open tenders in this sector