OpenRequest for bids
Four grid-scale battery energy storage systems with three years of O&M, Belize
The published deadline has not passed. The buyer reports no separate status. EPC Feed last checked the official record on 23 October 2026.
Bid deadline
Closes in 24 days
- As stated
- Belize time (UTC−06:00)
- In UTC
- 23 Nov 2026, 21:00 UTC
- Time zone
- As stated in the notice
The notice gives 3:00 p.m. local Belize time.
Scope
Turnkey design, supply, installation, testing, commissioning and three years of operation and maintenance of four grid-forming/grid-following battery storage facilities at Belize Electricity Ltd. substations, with minimum capacities of 10.8 MW / 43.2 MWh at Westlake (22 kV), 10.8 MW / 43.2 MWh at Dangriga (22 kV), 10.8 MW / 43.2 MWh at Buena Vista (34.5 kV) and 12.7 MW / 50.8 MWh at San Pedro (34.5 kV). The World Bank listing describes the package as 45 MW / 180 MWh; the notice text also refers to integrating 40 MW of storage.
Official documents and links
- Official notice (World Bank)Official notice
Sources
This page summarises the official notice; bidders must rely on the official documents. Notice an error or an update from the buyer? Tell EPC Feed.