OpenContract notice
Charrat wind park: design, supply, erection and maintenance of two wind turbines, Switzerland
Original title: Conception, fourniture, montage et maintenance de deux éoliennes à Charrat
The published deadline has not passed. The buyer reports no separate status. EPC Feed last checked the official record on 23 October 2026.
Bid deadline
Closes in 46 days
- As stated
- UTC+01:00 (UTC+01:00)
- In UTC
- 15 Dec 2026, 15:00 UTC
- Time zone
- As stated in the notice
TED records 16:00 with a +01:00 offset.
Scope
Second phase of the Charrat wind park: design, supply, erection and maintenance of two turbines of at least 4 MW each with a maximum mast height of 110 m, connected underground to the existing network and monitored remotely. Maintenance and remote monitoring run for the certified 25-year operating life, with possible extension. The building permits are in force; the test turbine Adonis has operated since 2012.
Official documents and links
- Official notice (TED)Official notice
- Submission (simap.ch)Procurement portal
Sources
This page summarises the official notice; bidders must rely on the official documents. Notice an error or an update from the buyer? Tell EPC Feed.